Pelican Bay Ltd. mixer structure refurb

Another excellent project turn around by the Blast Services crew was performed during the holidays while most were eating, relaxing and spending time off.
This project was like typical projects in the past. They need it done fast, they need it done thoroughly and they need it done right.
We started right away by prepping the room and boarding off what needed to be protected even though a contractor was coming in behind us to renovate the room. We took an approach of using the lower dusting media available due to the proximity of the ongoing work still being performed in the building.

Here we have our Black Maxx dust collection fan and sock in place. This is done in order to draw as much dust
Into the sock and keep the building from becoming overrun in a non visible environment.

IMG_0749.JPG

IMG_0748.JPG

IMG_0799.JPG

IMG_0782.JPG

These are some before during and after shots. We consulted our paint rep for the cover up and Sherwin Williams Macropoxy 646 in safety red was the final choice due to the USDA stamp it carries.

IMG_0752.JPG

IMG_0783.JPG

IMG_0854.JPG

Two full coats applied and it the final
result looks fantastic!

Here are some more general shots…

IMG_0790.JPG

IMG_0753.JPG

IMG_0789.JPG

IMG_0788.JPG

IMG_0822.JPG

IMG_0834.JPG

IMG_0835.JPG

IMG_0842.JPG

IMG_0857.JPG

IMG_0852.JPG

Be Sociable, Share!

Leave a Reply